Construction Projects - 2008 Bond Program
 
Items Planned in Future Bond Sales (unless specified complete)
 
Add Science labs
Add office space for instruction coaches, floating teachers along with additional computer lab for their use
Addition of student computer lab
Install fencing between high school and middle school (completed)
Replace Science classroom furniture & equipment
Install window in front foyer door for safety/security (completed)
Renovate restrooms in 100, 200, 300 & 600 hallways (scheduled, Summer, 2013)
Inspect & replace as needed drain waste piping in hallways 100, 200, 300 & 600 (scheduled, Summer, 2013)
Replace sinks, faucets, disposal and stops in Home Economics room
Replace all galvanized water piping in building (scheduled, Summer 2013)
Wire the walk-in cooler/freezer into emergency panel