Pine Forest Elementary
 
 
Construction Projects - 2008 Bond Program

Items Planned in Future Bond Sales (unless specified complete) 

Reinsulate chilled water piping
Replace (3) air handling unit coils
Replace air compressor & dryer controls
Replace domestic water heater (scheduled summer, 2013)
Install walk-in freezer assembly with 216 sq. ft. with shelving