Construction Projects - 2008 Bond Program
 
Items Planned in Future Bond Sales (unless specified complete)
 
Replace, as needed, drains, vents and toilet hangers in 300, 400 & 600 hallways
Replace sinks in 300 and 400 restrooms by library
Insulate chilled water lines and replace ceiling tiles completed Summer, 2010
Add chemical pot feeder for chilled water loop
Repair insulation damage on chill water piping.  Replace chill water pipe insulation with close cell foam insulation completed Summer, 2010
Replace (2)  A/C units in T-buildings with 3-ton units
Replace heating hot water and chiller water secondary pumps
Replace Library HVAC system with appropriate size/tonnage completed Summer, 2010
Replace water heaters completed Summer, 2011