Items Planned in Future Bond Sales (unless specified complete)                                 

Replace original exterior doors that do not function properly         
Replace entire kitchen & kitchen bathroom floors with quarry tile scheduled Summer, 2013
Replace existing walk in cooler and freezer in kitchen
Install (1) three compartment sink with inserts in kitchen
Replace cafeteria electronic drinking fountain
Install walk-in assembly with new 216 sq ft. with shelving
Replace office rooftop unit DX scheduled Summer, 2013
Add parking lot lights in front and back of building - completed Spring, 2011 using PTA Funding
Replace hot and chilled water piping insulation in main mechanical room
Replace secondary chilled water pump